Pelee Island - Leamington - Kingsville Dock Rehabilitation
Pelee Island, Ontario, Canada
Ferry Dock Rehabilitation at Pelee Island, Leamington and Kingsville. The Scope of this work consists of dredging, structural support to existing docks and pile repairs.
View Project Sheet
Completion Date November, 2009
Owner Ministry of Transportation
Floating Wharf Installation
Digby, Nova Scotia, Canada
Supply and installation of 6 each Galvanized H-Piles and installation of 14 each owner supplied 600mm diameter pipe piles. Also included installation of 11 each Treated Timber Floating Wharf Modules and 3 each Access Gangways.
View Project Sheet
Completion Date September, 2009
Owner Digby Port Authority
Toronto Hydro Test Wind Tower
Toronto, Ontario, Canada
Installation of a temporary weather station offshore of Scarborough. The weather station will be fabricated by McNally and installed in approximately 40 feet of water. The station will be left operational for a minimum of one year to gather weather data. A decision on further development of the wind farm will be based on the data collected.
View Project Sheet
Completion Date August, 2009
Owner Toronto Hydro Energy Services
Salter Street Boardwalk
Halifax, Nova Scotia, Canada
Construction of timber boardwalk extension along the Halifax water front for the Waterfront Development Corporation Limited to allow for the construction of a new building in the future.
View Project Sheet
Completion Date May, 2009
Owner Waterfront Development Corporation Limited
Martin Marietta Emergency Assistance
Auld's Cove, Nova Scotia, Canada
Emergency services to bring rock quarry wharf load out facility back into operation after steel sheet pile wharf failure.
View Project Sheet
Completion Date March, 2009
Owner Martin Marietta Materials Canada