Southampton Water Treatment Plant Raw Water Intake
Saugeen Shores, Ontario, Canada
Water Treatment Plant Raw Water Intake consisting of supply and installation of shore pipe & marine pipe of 750mm HDPE, Intake Structure, Scour Protection & Artificial Reefs, Chlorine & Sampling lines inside the intake. Some dredging is also involved.
View Project Sheet
Completion Date September, 2009
Owner Town of Saugeen Shores
Deep Panuke Pipeline Shore Access
Goldboro, Nova Scotia, Canada
Primary subcontract for the marine & onshore scope associated with the Deep Panuke offshore gas pipeline landfall. The project included a 1,100m trench dredged in heavy till with both land and marine based rock blasting. The shore based transition trench was excavated and the pipeline pulled from the offshore Allsea pipelay vesse ‘Lorelay’ onto shore using a 500 ton Bezemer winch. The entire pipeline was carefully backfilled following the successful pull-in operations.
View Project Sheet
Completion Date September, 2009
Owner Encana Corporation
Northern Pulp River Crossing
Pictou, Nova Scotia, Canada
Construction of a 4100 ft – 36” dia. HDPE effluent pipeline across the East River to replace deteriorating existing FRP pipeline.
View Project Sheet
Completion Date June, 2009
Owner Northern Pulp NS Corporation
Wolfe Island Cable Crossing and Structures
Kingston, Ontario, Canada
Dredging of 650 meters of rock trench, 2 meters wide by 2 meters deep and 250 meters of on-shore rock trench. Placing of HDPE conduits and backfilling of trench after cable laid by Client. Construction of 2 on-shore concrete joint structures for cable termination.
View Project Sheet
Completion Date October, 2008
Owner Canadian Renewable Energy
Courtice W.P.C.P. - Effluent Outfall
Courtice, Ontario, Canada
Installation of 1000 m of 1650 mm dia. CPP outfall sewer pipe from a drop shaft chamber into Lake Ontario, with 15 diffusers. Work involved excavation of trench in hard till, disposal of excavated material, installation of pipe and stone bedding in trench, backfilling trench, topping with armour stone for protection, fish shoals and a drop shaft chamber on shore.
View Project Sheet
Completion Date March, 2006
Owner Municipality of Durham