Docks - Wharfs Projects (8 Found)
Point Tupper Coal Handling

Completion Date: October 2004, Location: Point Tupper, NS, Canada

Construction of a wharf for Coal Handling. Consisting 5 concrete cribs, 2 bridge spans and 11 pile support piers

CP Rail Britt Wharf

Completion Date: September 2004, Location: Britt, Ontario, Canada

New Fuel Wharf, with concrete deck and steel pipe pile support. Completed in 60 days

Bear Head LNG Terminal

Completion Date: Spring 2007, Location: Point Tupper, Nova Scotia, Canada

The marine terminal, a Design/Build project, will receive ships containing liquefied natural gas delivered from overseas. The jetty terminal shall be ...

Raglan Mine-Deception Bay Wharf Rehabilitation

Completion Date: Fall 2007, Location: Deception Bay, Quebec, Canada

Rehabilitation of an existing wharf including dredging of clean and contaminated sediments, placing of mattress material, unloading, storing and monit...

Fundy Gypsum Hansport

Completion Date: July 2003, Location: Hantsport, NS, Canada

Demolition of existing wharf structure and construction of a new wharf consisting of 10 pile supported dolphins.

Martin Marietta Wharf Facility

Completion Date: December 2005, Location: Aulds Cove, NS, Canada

Steel Sheet Pile Bulkhead and Loadout Support Structure Construction of 650 foot SSP marginal wharf and new ship loader foundation.

Wallace Cove Wharf Facility

Completion Date: September 2006, Location: Wallace Cove, NS, Canada

New Ferry Terminal consisting of a pipe pile supported wharf and lift bridge ramp. This structure is the mainland terminal for the Grand Manan Ferry.

Shell Canada Limited

Completion Date: April 2007, Location: Corunna, Ontario, Canada

Repair Shell Canada Refinery North Dock. This project consisted of demolition of the damaged areas and total dock reconstruction including 50 No.&ndas...

Featured Projects

16th Avenue Phase 2 Trunk Sewer

Completion Date: October 2007, Location: Markham, Ontario, Canada

Regional Municipality of YorkDesign-Build Trunk Sanitary Sewer

Sheppard Subway Twin Tunnels

Completion Date: 2000, Location: Toronto, Ontario, Canada

Sheppard Subway Twin TunnelsContract SH-OO-C1Yonge Street to Don Mills Rd.

CP Rail Britt Wharf

Completion Date: September 2004, Location: Britt, Ontario, Canada

New Fuel Wharf, with concrete deck and steel pipe pile support.Completed in 60 days

Enwave Cooling Water Intake Pipe

Completion Date: September 2003, Location: Toronto Island, Ontario, Canada

Installation of 3 - 1600mm diameter HDPE Pipe x 5500m and associated on shore civil works

Raglan Mine-Deception Bay Wharf Rehabilitation

Completion Date: Fall 2007, Location: Deception Bay, Quebec, Canada

Rehabilitation of an existing wharf including dredging of clean and contaminated sediments, placing of mattress material, unloading, storing and monit...

Niagara Tunnel Facility Project

Completion Date: Fall 2007, Location: Niagara Falls, Ontario, Canada

Sub-contract to Dufferin Construction Company. Work includes construction of 1000 m of new precast concrete acceleration & shore approach walls, d...

Bathurst Collector and Langstaff Trunk Sewer Project

Completion Date: November 2008, Location: Vaughan, Ontario, Canada

A design build project being completed by McNally / Aecon Joint Venture and MacViro Consultants Inc. The project includes 8625 m 2.74 m inner diamete...