Completion Date: October 1999, Location: Burlington Ship Channel Hamilton, Ontario, Canada
Dredging of approximately 12,000 m³ of material from the ship channel for disposal by lake dumping.
Bronte Inner Harbour DredgingCompletion Date: March 2000, Location: Bronte Harbour Oakville, Ontario, Canada
Dredging of approximately 20,000m³ of material and disposing of it by trucking it to a local landfill as topsoil
Palgrave Pond DredgingCompletion Date: September 30, 2000, Location: Palgrave Pond - Bolton, Ontario, Canada
Dredging of 21,000 m³ of very wet peat type material from a pond and disposing of material by spreading it on land for later use as topsoi...
Oakville Harbour DredgingCompletion Date: March 2001, Location: Oakville Harbour, Ontario, Canada
Dredging of approximately 19,000 m³ from the harbour. The material was very soft organic debris that had been deposited over several years
Chrysler Park Marina DredgingCompletion Date: January 2001, Location: Chrysler Marina Morrisburg, Ontario, Canada
Dredging of approximately 10,000 m³ for both the Main Entrance Channel as well as the New Boat Basin Area for the Chrysler Park Marina in anticip...
St. Clair River - Maintenance DredgingCompletion Date: 2002, Location: St. Clair River Wallaceburg, Ontario, Canada
PWGSC Project No. 104439St. Clair RiverSoutheast Bend Cutoff ChannelMaintenance Dredging 2001
Bruce Mines DredgingCompletion Date: August 1995, Location: Shipping Channel, Bruce Mines, Ontario, Canada
Dredging of Shipping Channel, approximately 114,000m3 of medium to hard clay, silt, sand and gravel mixture which was pumped into a pre-constructed co...
Thunder Bay DredgingCompletion Date: October 2001, Location: Mission Bay Disposal Facility Thunder Bay, Ontario, Canada
Dredging of Mission Bay Disposal area, approximately 146,000m3 of medium to hard clay, silt, sand and gravel mixture which will be pumped into a pre-c...
Lake Wabukayne Sediment RemovalCompletion Date: Spring 2006, Location: Lake Wabukayne Mississauga, Ontario, Canada
Dredging 15,000 m3 of sediment from Lake Wabukayne. Contract # 17 111 04143
Windermere Basin RehabilitationCompletion Date: 1990, Location: Hamilton Harbour Hamilton, Ontario, Canada
Dredging of approximately 340,000 m³ from the harbour. The material was very soft organic debris that had been deposited over several years
Fairview Cove Container TerminalCompletion Date: March 2005, Location: Halifax, NS, Canada
Dredging of the berth area to -17m and shoring 600m of wharf face with SSP's.
Thunder Bay Mechanical DredgingCompletion Date: Fall 2007, Location: Thunder Bay, Ontario, Canada
Dredging of approximately 30,000m³ of silt, sand, clay and gravel mixture which will be loaded into the dump scows, towed and bottom dumped at th...