Dredging Projects (12 Found)
Burlington Ship Channel Dredging

Completion Date: October 1999, Location: Burlington Ship Channel Hamilton, Ontario, Canada

Dredging of approximately 12,000 m³ of material from the ship channel for disposal by lake dumping.

Bronte Inner Harbour Dredging

Completion Date: March 2000, Location: Bronte Harbour Oakville, Ontario, Canada

Dredging of approximately 20,000m³ of material and disposing of it by trucking it to a local landfill as topsoil

Palgrave Pond Dredging

Completion Date: September 30, 2000, Location: Palgrave Pond - Bolton, Ontario, Canada

Dredging of 21,000 m³ of very wet peat type material from a pond and disposing of material by spreading it on land for later use as topsoi...

Oakville Harbour Dredging

Completion Date: March 2001, Location: Oakville Harbour, Ontario, Canada

Dredging of approximately 19,000 m³ from the harbour. The material was very soft organic debris that had been deposited over several years

Chrysler Park Marina Dredging

Completion Date: January 2001, Location: Chrysler Marina Morrisburg, Ontario, Canada

Dredging of approximately 10,000 m³ for both the Main Entrance Channel as well as the New Boat Basin Area for the Chrysler Park Marina in anticip...

St. Clair River - Maintenance Dredging

Completion Date: 2002, Location: St. Clair River Wallaceburg, Ontario, Canada

PWGSC Project No. 104439St. Clair RiverSoutheast Bend Cutoff ChannelMaintenance Dredging 2001

Bruce Mines Dredging

Completion Date: August 1995, Location: Shipping Channel, Bruce Mines, Ontario, Canada

Dredging of Shipping Channel, approximately 114,000m3 of medium to hard clay, silt, sand and gravel mixture which was pumped into a pre-constructed co...

Thunder Bay Dredging

Completion Date: October 2001, Location: Mission Bay Disposal Facility Thunder Bay, Ontario, Canada

Dredging of Mission Bay Disposal area, approximately 146,000m3 of medium to hard clay, silt, sand and gravel mixture which will be pumped into a pre-c...

Lake Wabukayne Sediment Removal

Completion Date: Spring 2006, Location: Lake Wabukayne Mississauga, Ontario, Canada

Dredging 15,000 m3 of sediment from Lake Wabukayne. Contract # 17 111 04143

Windermere Basin Rehabilitation

Completion Date: 1990, Location: Hamilton Harbour Hamilton, Ontario, Canada

Dredging of approximately 340,000 m³ from the harbour. The material was very soft organic debris that had been deposited over several years

Fairview Cove Container Terminal

Completion Date: March 2005, Location: Halifax, NS, Canada

Dredging of the berth area to -17m and shoring 600m of wharf face with SSP's.

Thunder Bay Mechanical Dredging

Completion Date: Fall 2007, Location: Thunder Bay, Ontario, Canada

Dredging of approximately 30,000m³ of silt, sand, clay and gravel mixture which will be loaded into the dump scows, towed and bottom dumped at th...

Featured Projects

16th Avenue Phase 2 Trunk Sewer

Completion Date: October 2007, Location: Markham, Ontario, Canada

Regional Municipality of YorkDesign-Build Trunk Sanitary Sewer

Sheppard Subway Twin Tunnels

Completion Date: 2000, Location: Toronto, Ontario, Canada

Sheppard Subway Twin TunnelsContract SH-OO-C1Yonge Street to Don Mills Rd.

CP Rail Britt Wharf

Completion Date: September 2004, Location: Britt, Ontario, Canada

New Fuel Wharf, with concrete deck and steel pipe pile support.Completed in 60 days

Enwave Cooling Water Intake Pipe

Completion Date: September 2003, Location: Toronto Island, Ontario, Canada

Installation of 3 - 1600mm diameter HDPE Pipe x 5500m and associated on shore civil works

Raglan Mine-Deception Bay Wharf Rehabilitation

Completion Date: Fall 2007, Location: Deception Bay, Quebec, Canada

Rehabilitation of an existing wharf including dredging of clean and contaminated sediments, placing of mattress material, unloading, storing and monit...

Niagara Tunnel Facility Project

Completion Date: Fall 2007, Location: Niagara Falls, Ontario, Canada

Sub-contract to Dufferin Construction Company. Work includes construction of 1000 m of new precast concrete acceleration & shore approach walls, d...

Bathurst Collector and Langstaff Trunk Sewer Project

Completion Date: November 2008, Location: Vaughan, Ontario, Canada

A design build project being completed by McNally / Aecon Joint Venture and MacViro Consultants Inc. The project includes 8625 m 2.74 m inner diamete...