Description
New Fuel Wharf, with concrete deck and steel pipe pile support.
Completed in 60 days
Equipment
McNo 102 Sectional Barge
American 9260 100 Ton Crane
Northwest 70D 80 Ton Crane
Northwest 50D 50 Ton Crane
Cat 325 Excavator
Cat IT28G Rubber Tire Loader
Method
Drilled 37 steel pipe piles, 800mm into rock with H-15 rotary head & fixed leads. Drilled 37 holes 5m into rock for 35mm tension bars and grouted. Fabricated temporary shoring for work off piles to form deck structure. Formed and poured 240m3 concrete deck structure. Completed 150m of shoreline protection and walkways, plus all mechanical piping to facilitate unloading of fuel.
Location
Britt, Ontario, Canada
Owner
CP Rail
Consultant
Hatch Mott MacDonald
Completion Date
September 2004
Contract Value
$2,000,000.00